Supporting OEM Production Continuity Through Tooling Transfer & Supplier Transition

When an existing supplier can no longer meet your production requirements, transferring established tooling can help protect supply continuity without the cost of starting again.

Kiyokuni supports OEMs and Tier 1 suppliers in moving established production from another manufacturer. Specialist engineers assess the existing press tooling, check whether it works with Kiyokuni’s equipment and make any necessary changes. Test parts are then produced and checked before reliable, long-term manufacturing begins.

Our Manufacturing Achievements & Quality Assurance

7,250m²

Telford Plant

100+

Engineering Professionals

35+

Years of Management Stability

21M

Parts Stamped Last Year

31

Power Presses Available

BSI 9001 Quality Management Systems logo
BSI 14001 Environmental Management logo
BSI IATF 16949 Automotive Quality Management logo

Supplier Transition & Production Continuity Support

A manufacturing supplier change can occur when an organisation's needs are not being met. The most common issues these companies face include:

  • Supplier failure
  • Quality issues
  • Capacity limitations
  • Supply chain disruption
  • Business restructuring
  • Need to relocate production

Without careful planning and consideration, manufacturers can be faced with a variety of challenges, such as:

  • Production delays
  • Programme disruption
  • Quality uncertainty
  • Additional tooling investment
  • Loss of manufacturing continuity

Kiyokuni helps OEMs and Tier 1 suppliers transfer existing press tooling and move established production into a stable manufacturing environment. Our engineers specialise in:

  • Assessing existing press tooling
  • Supporting engineering changes
  • Validating transferred production
  • Integrating tooling into a stable manufacturing environment
  • Providing long-term production capability

Existing tooling represents a significant engineering and financial investment. Where possible, Kiyokuni reuses or adapts transferred tooling to reduce costs, minimise disruption and maintain production continuity.

Existing Tooling Assessment & Transfer Planning

Kiyokuni has the experience and expertise to take over an existing production programme. Before the transfer begins, our engineers assess the inherited press tooling and production requirements.

The assessment covers:

  • Tool condition, dimensions and maintenance history
  • Component drawings, materials and tolerances
  • Required production volumes
  • Compatibility with Kiyokuni’s presses, feed systems and supporting equipment
  • Any repairs, adjustments or engineering modifications needed

This process identifies risks such as tool wear, damage, equipment incompatibility or inconsistent part quality.

Our engineers then create a controlled transfer plan covering any tooling modifications, installation, production trials and quality approval. Our commitment to quality helps reduce transition risk and provides a clear route into reliable, long-term production.

Tooling Adaptation, Optimisation & Engineering Support

Existing tooling may not be immediately compatible with a new manufacturing environment. Kiyokuni’s engineers can identify the modifications needed to integrate transferred tooling with our presses, feed systems and production processes.

This may involve:

  • Modifying tooling to suit Kiyokuni’s equipment
  • Repairing worn or damaged components
  • Identifying opportunities to optimise tooling performance
  • Resolving technical issues found during production trials
  • Improving reliability through ongoing tooling maintenance

Where possible, Kiyokuni can adapt and run existing tooling. This helps customers avoid unnecessary tooling investment, reduce transfer costs and move into production sooner. By addressing compatibility and performance issues early, our engineering-led approach can also reduce downtime, limit project risk and support reliable long-term production.

Production Transfer & Manufacturing Ramp-Up

As an experienced replacement manufacturing supplier, Kiyokuni can take ownership of the complete production transfer process. This includes everything from planning the supplier transition and transferring existing tooling to validating the process and establishing reliable ongoing production. Each stage is carefully managed to reduce downtime, control risk and protect continuity of supply.

Programme and Supply Review
We review component specifications, production volumes, delivery schedules, current stock levels and supply risks. This helps us coordinate the move from the existing supplier and plan how continuity will be maintained during the transition.

Tooling and Process Assessment
Existing press tooling is inspected for condition, compatibility and performance. Drawings, material specifications, tolerances, production records and quality requirements are also reviewed to identify potential risks.

Transfer Planning
A controlled plan is created for collecting, transporting, installing and commissioning the tooling. Responsibilities, timescales and approval requirements are agreed in advance to reduce delays and programme disruption.

Tooling Adaptation and Installation
Our engineers install the tooling and complete any necessary repairs or modifications. This ensures it can operate safely and reliably with Kiyokuni’s presses, feed systems and production processes.

Production Trials and Quality Validation
Trial components are produced and inspected against the agreed specification. Any tooling or process issues are resolved before production approval.

Controlled Production Launch
Once approved, production begins according to the agreed schedule. Output, component quality and delivery performance are closely monitored during the initial production period.

Stable Ongoing Production
After the programme has been successfully transferred, Kiyokuni supports reliable repeat production through quality monitoring, preventative tooling maintenance and continuous process improvement.

High-Volume Manufacturing Capability After Tooling Transfer

Once the tooling and production process have been validated, Kiyokuni can provide the capacity required for stable, long-term supply. Our Telford facility has 31 presses ranging from 25 to 400 tonnes, supporting high-volume presswork for demanding production programmes.

Controlled processes, quality monitoring and preventative tooling maintenance help maintain repeatability across every production run. This allows us to meet demanding requirements for component quality, production volumes and delivery schedules.

Whether supporting an OEM or Tier 1 supplier, Kiyokuni provides a reliable manufacturing environment for ongoing production. For automotive tooling transfer programmes, our scalable capacity and engineering expertise help maintain a consistent supply of quality components long after the initial move is complete.

Quality & Process Control

Kiyokuni operates to IATF 16949, ISO 9001 and ISO 14001 standards. Components are inspected at key stages and remain traceable throughout production. Processes are closely monitored so potential issues can be addressed early. This attention to detail supports consistent quality, reliable output and continuous improvement.

Need to Transfer Production Without Disrupting Supply?

Kiyokuni provides a controlled route from supplier transition to long-term production. Speak to our team about your existing tooling, production volumes and supply requirements. We’ll assess your programme and explain how we can help protect continuity throughout the transfer. Fill in our contact form, give us a call on 01952 292 920 or email us at sales@kiyokuni.co.uk to speak to a member of our experienced team.