Making it Easy to Change Your Metal Pressing Supplier

WHY THIS GUIDE MATTERS

Changing suppliers shouldn't feel like jumping out of a plane without a parachute. Yet 73% of UK manufacturers delay switching suppliers due to perceived risks.

Our guide to changing supplier for all your metal pressing needs takes you through the steps we put in place to eliminate those concerns.

 

Guide to changing your metal pressing supplier

PHASE 1: PREPARATION & ASSESSMENT

Our partnership health check

✓ Technical audit - We review your existing parts, specifications, and quality requirements
✓ Capacity matching - Ensuring we can handle your volumes from day one
✓ Systems integration - Aligning our processes with your existing workflows
✓ Cost benchmarking - Identifying immediate savings opportunities

What we need from you

  • Current part specifications and drawings
  • Volume forecasts and delivery requirements
  • Quality standards and inspection criteria
  • Existing supplier performance metrics
  • Part history including previous problems

Take a look at our services where we have listed all of the presses we work on.

PHASE 2: SEAMLESS TRANSITION PLAN

The zero-risk approach

Week 1-2: Foundation setting

  • Dedicated transition manager assigned
  • Joint project timeline established
  • Quality agreements signed
  • Tooling requirements assessed

Week 3-6: Pilot programme

  • Start with non-critical components
  • Small batch trials for quality validation
  • Process optimisation and fine-tuning
  • Your approval before any volume increase

Week 7-12: Gradual volume transfer

  • Phased ramp-up of production
  • If required parallel supply during transition period
  • Real-time quality monitoring
  • Continuous feedback and adjustment
Tandem Presses

PHASE 3: RISK MITIGATION STRATEGIES

We've got you covered

Quality assurance

  • Full PPAP Level 3 documentation provided if required
  • First article inspection reports
  • Process control implementation
  • Third-party verification available

Supply continuity

  • Buffer stock maintained during transition
  • Emergency production protocols in place
  • Alternative delivery routes established
  • 24/7 support during critical periods

Administrative support

  • Single point of contact throughout
  • Simplified paperwork and processes
  • EDI integration within 48 hours
  • Consolidated reporting and invoicing

PHASE 4: VALUE-ADDED BENEFITS

More than just a supplier change

Immediate cost savings

  • Material optimisation analysis
  • Process efficiency improvements
  • Reduced waste and scrap rates
  • Consolidated shipping arrangements

Long-term partnership value

  • Continuous improvement programmes
  • Technology upgrade pathways
  • Sustainability reporting and initiatives
  • Strategic planning support
Press Brake machine bending large part

THE KIYOKUNI GUARANTEE

What makes us different

✓ Zero disruption promise - Your production never stops
✓ Quality first approach - We meet or exceed current standards
✓ Transparent communication - Weekly progress reports and updates

Aluminium Pressing 8

READY TO MAKE THE SWITCH?

Your next steps

  1. Book your free assessment
    30-minute consultation to understand your specific requirements
  2. Receive your transition plan
    Customised roadmap with timelines and milestones
  3. Start your risk-free pilot
    Small-scale trial with full support and monitoring

We look forward to working with you. Simply fill in the box below and we can have a chat.